Project Description
Client: St Charles Borromeo Catholic Church
Location: Riverside, CA
Year Completed: 2022
Architect: Charles Brown Architect
Designer: RCCD Inc.
Client: St. Joseph’s Church
Location: Fontana, CA
Year Completed: 2019
Value: $170,000
Renovate church and hall by replacing all doors and hardware, removing acoustic texture throughout, and applying new texture and paint. Remove and replace all flooring. Install new architectural detailing, a state-of-the-art A/V system, and lighting.
Client: St. Paul The Apostle
Location: Chino, CA
Year Completed: 2017
Value: $461,000
Remove vegetation and existing sidewalks. Develop a site for better drainage and rework retention basin. Put in new sidewalks, handicap ramps, and planters. Pave asphalt and stripe new drive and parking lot. Install new light poles including solar lights in the parking lot. Plan and install 14,500 ft.² of new landscaping and irrigation.
Client: St. Joseph Elementary School
Location: Upland, CA
Year Completed: 2016
Value: $750,000
Build new multi-purpose building and outdoor amphitheater. Building designed and constructed to include large room with air walls, 2 restrooms and kitchenette. Outdoor concrete amphitheater built to accommodate student body rallies and events.
Client: Diocese of San Bernardino/Our Lady of Guadalupe Church
Location: Chino, CA
Year Completed: 2019
Value: $210,000
Remove existing damaged roof from original Church building and retrofit with new roof system that includes trusses and other state-of-the-art technical reinforcement for seismic protection.