La Quinta Catholic Church Project

 

Project Description

Client: St Louis Catholic Church
Details: New construction of an Adoration Chapel
Location
: La Quinta, CA
Year Completed: 2023
General Contractor: Rob Clark Construction

Saint Charles Borromeo

Project Description

Client: St Charles Borromeo Catholic Church
Location: Riverside, CA
Year Completed: 2022
Architect: Charles Brown Architect
Designer: RCCD Inc.

The Treatment Boutique Newport Beach

Project Description

Client: The Treatment Boutique
Location: Newport Beach, CA
Year Completed: 2019
Value: $220,000

Complete interior renovations to support the new tenant. Renovations included new HVAC system, T-bar ceiling, plumbing, cabinetry, flooring, wall texture and painting, upgrade of all electrical systems and interior lighting, door hardware, plumbing fixtures, window coverings, specialty wall treatments, retail shelving, window tinting and company signage for interior and exterior.

St. Joseph’s Church Fontana

Project Description

Client: St. Joseph’s Church
Location: Fontana, CA
Year Completed: 2019
Value: $170,000

Renovate church and hall by replacing all doors and hardware, removing acoustic texture throughout, and applying new texture and paint. Remove and replace all flooring. Install new architectural detailing, a state-of-the-art A/V system, and lighting.

St. Paul The Apostle Chino

Project Description

Client: St. Paul The Apostle
Location: Chino, CA
Year Completed: 2017
Value: $461,000

Remove vegetation and existing sidewalks. Develop a site for better drainage and rework retention basin. Put in new sidewalks, handicap ramps, and planters. Pave asphalt and stripe new drive and parking lot. Install new light poles including solar lights in the parking lot. Plan and install 14,500 ft.² of new landscaping and irrigation.

Saint Catherine Sanctuary Renovation

Project Description

Client: Saint Catherine of Alexandria
Location: Riverside, CA
Year Completed: 2018
Value: $160,000

Demo existing sanctuary steps, fabricate and install new stone steps and risers. Patch, repair, polish and seal terrazzo flooring.  install new doors with panic hardware. Fabricate and install new custom stone baptismal font with infinity edge including all necessary plumbing and electrical requirements.

Boys & Girls Club of Pasadena

Project Description

Client: Boys & Girls Club
Location: Pasadena, CA
Year Completed: 2017
Value: $249,600

Repair HVAC and roof on the main building. Remove all exterior siding, coping, lighting, conduit, and supply and install all new. Refurbish and paint exterior gates and fencing. Remove old damaged paving and concrete work, curbs and planters, shrubs, and trees. Replace asphalt and restripe parking lot.

Damien High School Football Locker Room

Project Description

Client: Damien High School
Location: La Verne, CA
Year Completed: 2019
Value: $26,000

Install new flooring, paint interior, replace light fixtures. Remodel bathrooms and showers.

Boys & Girls Club of Metro Los Angeles

Project Description

Client: Boys & Girls Club of Metro Los Angeles
Location: Various
Year Completed: 2016
Value: $70,000 – $150,000

The Challenges

Install new basketball courts and resurface old courts. Renovate basketball courts and playing fields at various clubs throughout Los Angeles. Partner with Los Angeles Lakers Youth Foundation and Los Angeles Chargers to feature donor colors and logos.

Boys & Girls Club Bell Gardens

Project Description

Client: Boys & Girls Club Metro Los Angeles
Location: Bell Gardens, CA
Year Completed: 2017
Value: $470,476
Architect:  Jason & Perry

The Challenges

Renovate entire interiors of facility, install security systems, furnish classrooms, lounge/game room and STEM lab, and reconfigure baths to be ADA compliant.